Description
Replacement Antenna for 4 Function Wireless Remote Control with 5 meter long length lead. This is to Allow the Antenna to be placed on the roof of a building. This Item requires soldering to attach the wire to the receiver board.
$25.00
Replacement Antenna with long lead wire for 4 Function Wireless Remote Controls.
10 in stock
Replacement Antenna for 4 Function Wireless Remote Control with 5 meter long length lead. This is to Allow the Antenna to be placed on the roof of a building. This Item requires soldering to attach the wire to the receiver board.