I am currently away from the shop and won't be accepting new orders until I'm back. Thank you for your patience.

Replacement Antenna Long lead wire

$25.00

Replacement Antenna with long lead wire for 4 Function Wireless Remote Controls.

Description

Replacement Antenna for 4 Function Wireless Remote Control with 5 meter long length lead. This is to Allow the Antenna to be placed on the roof of a building. This Item requires soldering to attach the wire to the receiver board.

Product Details

  • This antenna works with all of my 4 function remote kits.
  • Shipping weight 1 pound.
  • Ships the same day it was ordered on orders received before 3:30 PM EST.
  • Quantity shown above the add to cart button is the exact quantity in stock right this second.
  • We ship world wide.
  • Total height of mast including magnetic base 5.8 inches.
  • Length of wire 16 feet 5 inches.
  • If this Item is ordered with one of my 4 function remote kits I will install it for you at no additional charge.