Description
Replacement Antenna for 4 Function Wireless Remote Control with 8 meter long length lead. This is to Allow the Antenna to be placed on the roof of a building. This Item requires soldering to attach the wire to the receiver board.
Original price was: $55.00.$44.00Current price is: $44.00.
Replacement Antenna with long lead wire for 4 Function Wireless Remote Controls.
Replacement Antenna for 4 Function Wireless Remote Control with 8 meter long length lead. This is to Allow the Antenna to be placed on the roof of a building. This Item requires soldering to attach the wire to the receiver board.